Sectional controlled explosive demolition of the drainage construction in Karvali area, EGNATIA ODOS Motorway.
Controlled explosive demolition of the water supply tower, Hellenic Air Forces Airport (110 P.M.) Larissa
Preparation and result of the sectional controlled explosive demolition
Controlled explosive demolition of the 17-storey Red Cross Building in Messogion Avenue, Athens
CONTROLLED EXPLOSIVE DEMOLITION OF 8 BUILDINGS – concrete structures (simultaneous demolition of 4 buildings – the tallest building was about 40m) and plinths – big concrete blocks of old rotary kilns (the biggest plinth had 300m3 mass and 9m height) of the old factory, at Mantoudi, Evia, Greece (completion of works on 2/7/2015).
CONTROLLED EXPLOSIVE DEMOLITION SIMULTANEOUS DEMOLITION OF 6 BUILDINGS CONCRETE STRUCTURES OF THE OLD FACTORY AT MANTOUDI, EVIA, GREECE (Thursday 19/12/2013)
Controlled Explosive Demolition of the Overpass – Bridge at EGINIO INTERCHANGE at Ch. 468+000 of the Highway PATHE (Athens – Salonica) (Wednesday 25/9/2013)
Controlled Explosive Demolition of Pachis Bridge, Megara at C.H. 41+960 of the Highway Athens – Korinthos Highway (13/10/10)
Controlled Explosive Demolition of the Bridge – Overpass A223 at C.H. 37+016 on the Highway Korinthos – Patras (6/10/10)
Controlled Explosive Demolition of the Right Branch of Krathis bridge on the New Korinthos – Patras Highway (5/5/10)