CONTROLLED EXPLOSIVE DEMOLITION OF 8 BUILDINGS

CONTROLLED EXPLOSIVE DEMOLITION OF 8 BUILDINGS – concrete structures (simultaneous demolition of 4 buildings – the tallest building was about 40m) and plinths – big concrete blocks of old rotary kilns (the biggest plinth had 300m3 mass and 9m height) of the old factory, at Mantoudi, Evia, Greece (completion of works on 2/7/2015).