Contractor: |
MECHANIKI S.A. – HOCHTIEF A.G. |
Project: |
Construction of “ELEFTHERIOS VENIZELOS” the New Athens International Airport in Spata. |
EXORIXI: |
Blast Design and Vibration Monitoring. Removal of the Northern Hills (1/97-1/2000) |
|
Contractor: |
HOCHTIEF A.G.- ATHENA AETBE |
Project: |
Construction of “ELEFTHERIOS VENIZELOS” the New Athens International Airport in Spata. |
EXORIXI: |
Blast Design and Vibration Monitoring of the general excavations in the runways area (5/97) |
|
Contractor: |
MECHANIKI S.A. |
Project: |
Deviation of Kavala – EGNATIA ODOS MOTORWAY (Area Palio Kavalas) |
EXORIXI: |
Blast Design and Vibration Monitoring |
|
Contractor: |
J/V OSE PROJECT – EYTAXIA TUNNEL |
Project: |
New Railway Athens – Corinth, surface works close to urban areas |
EXORIXI: |
Blast Design, implementation and Vibration Monitoring of the surface blasting in the urban area of Loutropigi (9-10/97) |
|
Contractor: |
TEB S.A. (J/V ATTIKI ODOS MOTORWAY) |
Project: |
Surface excavations around the “Mavri Ora” Tunnels
(ATTIKI ODOS MOTORWAY) |
EXORIXI: |
Blast Design and Blasting Vibration Monitoring for Tunnels and Surface excavations. Blasting close to the water-supply canal from Mornos, close to the gas-pipe of DEPA, close to archaeological founds and close to buildings of Liosia urban area, which were already damaged from the recent earthquakes (5/98 – 2/02) |
|
Contractor: |
J/V AKTOR – ATTIKAT – TEB (J/V ATTIKI ODOS MOTORWAY) |
Project: |
Construction of the Western Peripheral Road of Ymittos
(ATTIKI ODOS MOTORWAY – A22, A21) |
EXORIXI: |
Blast Design and Blasting Vibration Monitoring in urban areas and close to the Nuclear Reactor EKEFE “DEMOKRITOS” (6/1998 – 7/2003) |
|
Contractor: |
J/V SARANTOPOULOS S.A. – ASTALDI S.p.A. |
Project: |
CONSTRUCTION OF EGNATIA ODOS MOTORWAY – Section: Krystallopigi – Psilorachi |
EXORIXI: |
Design, Supervision and Blasting Vibration Control (8/98- 3/99) |
|
Contractor: |
J/V TECH. OLYMPIAKI S.A. – MOCHLOS S.A. |
Project: |
EGNATIA ODOS MOTORWAY, SECT: LADOCHORI – LYKOPODI (1+100 – 8+000 km) |
EXORIXI: |
Blast Design and Blasting Vibration Monitoring close to an old Church (4/99) |
|
Contractor: |
J/V HEL.TECHODOMI S.A. – J&P (HELLAS) S.A. (J/V ATTIKI ODOS) |
Project: |
ATTIKI ODOS MOTORWAY CONSTRUCTION – Sections A15-A16-A17 |
EXORIXI: |
Blast design and basting vibration Monitoring, in a rocky trench of Paeania area (5/99-12/2000) |
|
Contractor: |
J/V METON – AKTOR – TEB – AEGEK |
Project: |
Construction of the traffic axis: Patra – Thessaloniki – Evzoni Sect.: The Railway Project by Kakia Skala |
EXORIXI: |
Study – Design and Surface Blasting Vibration Monitoring by the entrances and the tunnels (7-12/1999) |
|
Contractor: |
PANTECHNIKI S.A. |
Project: |
Construction of the WESTERN PERIPHERAL MOTORWAY OF AEGALEO – SOUTHERN JOINT CROSSING OF SKARAMANGA |
EXORIXI: |
Blast Design and Blasting Vibration Monitoring (10/99-11/02) – close to Military Fuel Tanks – close to archaeological founds – close to the natural gas pipeline (DEPA). |
|
Contractor: |
J/V ALPINE MAYREDER – ATTIKATT – EYCLEIDES |
Project: |
EGNATIA ODOS MOTORWAY SECT.: NEA KARVALI – CROSSING OF CHRYSOUPOLIS |
EXORIXI: |
Blast Design and Blasting Vibration Monitoring of Petropigi Excavation. Installation of a permanent Vibration Monitoring Control Network (3/2000 -12/2001) |
|
Contractor: |
J/V THEMELIODOMI S.A.- HEL.THECHNODOMIKI S.A.- PASSAVANT WERKE A.G.- GIOVANNI PUTIGNANO & Figli S.r.l. |
Project: |
Study and Construction 1st stage of the Athens’ biologic sewage treatment plant by Psytallia island |
EXORIXI: |
Blasting Vibration Monitoring Program (3/99-12/99) |
|
Contractor: |
J/V THEMELIODOMI S.A.- HEL.THECHNODOMIKI S.A.- PASSAVANT WERKE A.G.- GIOVANNI PUTIGNANO & Figli S.r.l. |
Project: |
Study and Construction 2nd stage of the Athens’ biologic sewage treatment plant by Psytallia island |
EXORIXI: |
Blast design and risk managment at the excavation site close to concrete structures and the biogas flare unit (8/01-4/02) |
|
Contractor: |
ELLINIKI TECHNIKI S.A. |
Project: |
Construction of the sea-side road connection Piraeus-Drapetsona-Keratsini. Sect. Lipasmata-Customhouse crossing. |
EXORIXI: |
Blast design and blasting vibration monitoring close to urban areas, preservative structures and fuel tanks of BP (4/2000 – 5/2002) |
|
Contractor: |
J/V AKTOR S.A. – ERGAS S.A. |
Project: |
EGNATIA ODOS MOTORWAY – Construction of 6 glen-bridges by the section II – Kavala Deviation |
EXORIXI: |
Blast design and blasting vibration monitoring close to the pedestal of the glen-bridge No 4. and the natural gas pipeline (DEPA)(11/2000- 2/2001) |
|
Contractor: |
J/V ABAX S.A. – BIOTER S.A. – G.E.K. S.A. |
Project: |
Olympic Village Construction & its Post-Olympic adaptation – Section D´ |
EXORIXI: |
Blast design and blasting vibration monitoring of the general excavations of the area and the excavations at the foundations (9-11/2001) |
|
Contractor: |
PANTECHNIKI S.A. |
Project: |
ATTIKI ODOS MOTORWAY – SECTION A06 (Zefyri region) |
EXORIXI: |
Blasting vibration monitoring (4-10/2001) |
|
Contractor: |
J/V AKTOR S.A. – ETETH S.A. – THEMELI S.A. – THEMELIODOMI S.A. |
Project: |
ANILIO TUNNEL & AG. NIKOLAOS TUNNEL (3.3) EGNATIA ODOS MOTORWAY |
EXORIXI: |
Blast vibration monitoring program of the tunneling project. Surface excavations for the western inlets of the tunnels (7-8/2002) |
|
Contractor: |
DEH S.A. (Hellenic Public Power Corporation) |
Project: |
ATHERINOLAKKOS New Power Plant. Earthmoving and excavation works. Environment modulation – Blast vibration monitoring and risk control |
EXORIXI: |
Vibration monitoring program for surface and underwater blasting and control – estimation of the effects on green concrete structures (9/02 – 3/03) |
|
Contractor: |
EYKLIDES S.A. |
Project: |
Vertical Axis of EGNATIA ODOS MOTORWAY – Ring Road of Thessaloniki. |
EXORIXI: |
Design, technical support and implementation of controlled blasting, avoiding flyrock in the rocky excavation of the K9 crossing (7/2003) |
|
Contractor: |
TERNA S.A. |
Project: |
Vertical Axis of EGNATIA ODOS Motorway, Siatista – Krystallopigi, final works on the section Koromilia – Dispilio |
EXORIXI: |
Blasting vibration monitoring (2002-2003) |
|
Contractor: |
ATHINAIKI TECHNIKI S.A. |
Project: |
New Ring-road of Volos. |
EXORIXI: |
Support and blasting vibration control in the excavation site close to Industried Area in Volos (10/2003) |
|
Contractor: |
KLEARCHOS G. ROUTSIS S.A. |
Project: |
EE/02 ROAD VARI-KOROPI, Section km 6+914 to km 11+145 |
EXORIXI: |
Blast Consulting & Engineering Services and blasting vibration monitoring during the opening of the rainwater drainage canal on the road (5/2003 – 5/2004) |
|
Contractor: |
DEH S.A. (HELLENIC PUBLIC POWER CORPORATION) |
Project: |
New Power Plant at Atherinolakkos, Lasithi Crete. |
EXORIXI: |
Blast design and vibration monitoring during the trench opening between the Main Power Plant Building and the secondary Plant (14. January 2004) |