Demolishing a building with explosives is a process which requires careful and detailed planning and continuous overall supervision at every stage.

It is vital that it is carried out exclusively by qualified professionals who have the appropriate training and logistical infrastructure.

In what cases is a building demolished with explosives?

Use of explosives is a good option for demolition of large buildings and large constructions especially in the following cases.

  • If the building to be demolished is located in a dangerous location such as for example sloping ground. 
  • If it is located too close to other buildings.
  • If there are strict restrictions regarding vibrations and their intensity in the area.
  • In cases where the building has been seriously damaged by earthquakes, fire or other events and presents an unstable structure.

This particular method of demolition presents significant advantages if done correctly. It offers significant savings in work time, is highly efficient and at the same time presents a reduced environmental burden.

What are the requirements to properly implement such a process?

First, when we are dealing with tasks that require the use of materials such as explosives, a proper and detailed study of the building and the surrounding area is important. Then it is necessary to take the prescribed security measures for the neighboring structures and infrastructures and of course for the personnel who will participate. Then, taking into account the direction of the fall of the building and the need to control the fragments that will be created, the explosives are strategically placed in the right places. The purpose is to achieve its correct and controlled demolition safely.

There are specific security measures.

The answer is yes. There are safety measures that must be strictly followed in every job in order to achieve the result we want with as little risk as possible.

  • Proper and detailed planning is everything. With proper study, measurements and assessment of the total space, there is the possibility for a complete picture. 
  • Proper use of protective equipment for those participating is essential
  • Provision should always be made for perimeter blocking of the site and removal of persons to avoid injury.
  • Use of reliable equipment with appropriate specifications and certifications.
  • After the completion of the demolition, the removal of the demolition debris must be carried out as provided for in accordance with the environmental regulations.

Building demolition with explosives is a process that requires professionalism and proper expertise. As long as all the steps are performed correctly, there is no risk to the safety of the participants or the overall environment. Do a proper research and trust the most suitable professionals.

Here you can see some demolition projects that our company has undertaken and completed.

Here you can see some demolition videos of our company.